2R Cooling replaced a commercial walk-in cooler in Tequesta, from removal of the old enclosure to assembly of the replacement box and installation of one condensing unit, two evaporators and copper refrigerant piping. Explore the job through ten real project photos.
2R Cooling removed the original enclosure, assembled the customer-supplied replacement box, installed one condensing unit serving two evaporators, ran the copper refrigerant piping and started the system.
The photo sequence documents removal of the original enclosure, the cleared footprint, wall and ceiling assembly, mounted evaporators and piping, work at the outdoor controls, and a later view of the stocked cooler interior.
For a new or replacement walk-in cooler, share the box dimensions, available equipment specifications, site access and known existing conditions. Those details help define the enclosure, equipment and refrigerant-piping scope before work is scheduled.
Call 2R Cooling or request service to discuss box dimensions, equipment specifications, site access and current scheduling availability.