2R Cooling installed ductwork for a construction company in Okeechobee, Florida. Six job photos document insulated duct runs, hanging supports, and ceiling boots during rough-in.
2R Cooling & Refrigeration completed a ductwork installation for a construction company on a new-construction project in Okeechobee, Florida. The work shown here focuses on the air-distribution system installed within the open framing.
The ductwork installation was completed by 2R Cooling. These photos document stages of the rough-in before the ceilings and walls were closed.
Building in Okeechobee? Contact 2R Cooling & Refrigeration to discuss your ductwork installation needs and request a project estimate.